All Categories
Featured

Extensive water recycling, with 70-80% percent of stormwater overflow from around the site filtered through natural wetlands and mechanical systems, and after that used to water the surrounding parkland. 4,609,504 gallons of rainwater captured annually. Annual carbon emissions decrease due to planting area of about 240,000 pounds of CO2 sequestered by trees on site 16.65 acres of total planting area (5.4 acres at SoFi Stadium, 2.75 acres at Lake Park, and 7 acres of streetscape planting, to name a few 6-plus miles of brand-new tracks and paths (4.17 miles of enhanced linear streetscape consisting of pathways, 1.89 miles of brand-new multi-use routes, and about 2,300 linear feet of new Class II on-street bikeways) More details in the full press release below: a near 300-acre sports and entertainment location being established by worked with a landscape architecture and urban style studio, to produce civic and environmentally conscious landscape solutions across 3 essential areas: water capture and reuse, the usage of one hundred percent Southern California-native plant species, and the ongoing advancement of public parks for year-round use.
Landscape Maintenance Services

Inspired by the initial water function that became part of the previous Hollywood Park racetrack, Lake Park consists of an upper and lower lake separated by cascading waterfalls. At approximately 6 acres and 16 million gallons of water, the lake is surrounded by an additional 6 acres of parkland. The lake functions as a water recycling system by collecting 70-80 percent of stormwater runoff from around the site, filtering it through natural wetlands and mechanical systems, and then using it to water the surrounding parkland.
Latest Posts

Steps for Renovating Existing Corporate Campuses
How Proactive Irrigation Lowers Operational Costs

Future-Proofing SoCal Commercial Assets for Drought